The ironwork around Rhydd Barn has all been re-painted. This includes the gutters and downpipes of the barn and converted pigsty and the metal handrail on the outside steps of the barn. Our decorator took the photographs below of the completed work.



The ironwork around Rhydd Barn has all been re-painted. This includes the gutters and downpipes of the barn and converted pigsty and the metal handrail on the outside steps of the barn. Our decorator took the photographs below of the completed work.



IN RESPONSE to guest requests we have installed two USB charging sockets in the Barn for your phones, tablets, etc—one downstairs in the kitchen/dining area and the other in the upstairs living room.
There is a new suitcase stand stored at the bottom of the bedroom wardrobe and spare blankets are now stored in a protective bag (as recommended at our last inspection). A second shoe and boot tray has been added downstairs.

Outside, we have filled the flower tubs and baskets with completely fresh compost and replanted them. We think something in the soil was negatively affecting their growth last year.

All gutters and down-pipes are being re-painted with Hammerite metal paint, as is the handrail of the Barn’s outside steps.
Guests have already expressed their appreciation of the new mattress on the bed and the champagne flutes.
We have been busy improving and repairing items around Rhydd Barn. For example:
Please note that candles are not permitted in the Barn for fire safety reasons.
We are extremely pleased to announce that Rhydd Barn has (again) attained the four star gold award standard in its annual assessment (carried out on 20 April 2018).
Here are a few highlights quoted directly from the report:
Time to get out our (also newly acquired for the Barn) champagne glasses!’

IN our ensuite bathroom a crack developed in the toilet seat. Unfortunately it was not possible to just replace the seat itself (‘no longer manufactured…’, ‘odd size toilet…’, etc) so a whole new and attractive toilet was installed. Since the photo was taken the floorboards have been improved around the base by sanding down and varnishing.

Here I am, on the first day of summer, in The Rhydd fields with our small border collie, Lottie, and next door’s labrador Summer (who many of you might know!).
—Rosemary, owner of Rhydd Barn
[soliloquy id=”829″]
Our plant pots on the patio have been refreshed and spring flowers – primroses – are appearing in the little wild flower meadow despite the cold weather. The new gates installed last year have been varnished to protect them.
We have been busy over the winter period with various maintenance works at Rhydd Barn. The converted stable to the north of the barn has been cleared out and decorated and our short-term plan is for guests to use it for secure storage (eg. for bicycles). Another water butt has been installed to help reduce mains water usage in the garden and on our patio plant containers. At the rear of the barn concrete has been added to fill in some small gaps and smoothen out the base of the stone wall. And, finally, the sewage treatment plant has been upgraded.
[soliloquy id=”824″]