We have carried out some necessary maintenance and repair work on Rhydd Barn:
- Re-pointing work on the lower part of the south exterior wall and converted pigsty.
- The inside of the south entrance door has been treated to prevent water entering.
- Wood surfaces at the end of the converted stable block have been painted.
- The metal gate to the grassy area behind the barn has been painted.
- The wooden entrance gate to Rhydd Barn has been treated to prevent algae and coated with a preservative.
- Fridge doorknob tightened—which was a much trickier job than it appeared to be!



